GranDSLAM™ 4200ATM Stackable DSLAMInstallation GuideDocument No. 4200-A2-GN20-10October 2002
About This Guideiv October 2002 4200-A2-GN20-10Document SummaryA master glossary of terms and acronyms used in Paradyne documents is available on the
4200-A2-GN20-10 October 20021-11InstallationOverviewThe GranDSLAM™ 4200 is a family of stackable DSLAMs designed for installation in the Central Offic
1. Installation1-2 October 2002 4200-A2-GN20-10PreparationConsider the following before installing the GranDSLAM 4200:Installation Site Your installa
1. Installation4200-A2-GN20-10 October 20021-3Cables RequiredTable 1-2 shows all the cables that may be required for your installation.Table 1-2. Cabl
1. Installation1-4 October 2002 4200-A2-GN20-10Unpacking the HardwareHANDLING PRECAUTIONS FOR STATIC-SENSITIVE DEVICES This product is designed to pr
1. Installation4200-A2-GN20-10 October 20021-5Table 1-3. Contents of Hardware Kit Shipped with the GranDSLAM 4200Appearance Description QuantityFlat-h
1. Installation1-6 October 2002 4200-A2-GN20-10Mounting Configurations Three basic installation configurations are available:Rack mount – see Install
1. Installation4200-A2-GN20-10 October 20021-73. Identify six flat-head screws (for 19-inch racks) or six machine screws (for 23-inch racks) provided
1. Installation1-8 October 2002 4200-A2-GN20-10Installing the GranDSLAM 4200 Into a RackTwo types of mounting screws are provided. Use:#10-32 mountin
1. Installation4200-A2-GN20-10 October 20021-93. Insert and tighten the screws in the top screw positions, then tighten the bottom screws. 4. Do not p
A October 2002 4200-A2-GN20-10Copyright © 2002 Paradyne Corporation.All rights reserved.Printed in U.S.A.NoticeThis publication is protected by federa
1. Installation1-10 October 2002 4200-A2-GN20-10Installing the GranDSLAM 4200 on a WallWall mounting requires two wood screws suitable for the weight
1. Installation4200-A2-GN20-10 October 20021-116. Install two wood screws (not provided) at the same height above the floor and 18.75 inches (476.25 m
1. Installation1-12 October 2002 4200-A2-GN20-10Installing the GranDSLAM 4200 on a Shelf or DesktopIf the GranDSLAM 4200 will be placed on a shelf or
1. Installation4200-A2-GN20-10 October 20021-13Installing the Uplink ModuleEach GranDSLAM 4200 requires an uplink module for connection to the ATM net
1. Installation1-14 October 2002 4200-A2-GN20-103. Slide the uplink module into the guide rails just inside the opening. Press the uplink module firm
4200-A2-GN20-10 October 20022-12CablingCabling OverviewThe GranDSLAM 4200 has a large variety of possible cabling configurations. This chapter describ
2. Cabling2-2 October 2002 4200-A2-GN20-10DSL PortsThe GranDSLAM 4200 DSL connector supports the tip and ring connections of up to 24 DSL ports over
2. Cabling4200-A2-GN20-10 October 20022-3Uplink Module ConnectorsThe following types of uplink modules are available for the unit:Model 4201 T1 Uplink
2. Cabling2-4 October 2002 4200-A2-GN20-104202 E1 Uplink Module ConnectorsThe 4202 E1 Uplink Module has two connectors, only one of which may be used
2. Cabling4200-A2-GN20-10 October 20022-53. Connect the other end of the cable to the appropriate network equipment such as a multiplexer.ProcedureTo
4200-A2-GN20-10 October 2002B Important Safety Instructions1. Read and follow all warning notices and instructions marked on the product or included i
2. Cabling2-6 October 2002 4200-A2-GN20-104203 T1/E1 IMA Uplink Module Port ConnectorsThe 4203 T1/E1 IMA Uplink Module supports eight operational T1/
2. Cabling4200-A2-GN20-10 October 20022-74. Connect the other end of the cable(s) to the appropriate network equipment such as an ATM switch.Or, if th
2. Cabling2-8 October 2002 4200-A2-GN20-10Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke The 4203 T1/E1 IMA Uplink is shipped with a fe
2. Cabling4200-A2-GN20-10 October 20022-9Management PortThe MGMT (management) port can be used to connect the GranDSLAM 4200 to a network management s
2. Cabling2-10 October 2002 4200-A2-GN20-10Console PortThe CONSOLE port normally serves as the primary user interface with the GranDSLAM 4200 during
2. Cabling4200-A2-GN20-10 October 20022-11ProcedureTo connect a modem to the CONSOLE port:1. Determine and procure the proper DCE cable type. The CONS
2. Cabling2-12 October 2002 4200-A2-GN20-10Alarm InterfaceThe alarm interface differs, depending on GranDSLAM 4200 model.Model 4210 – The ALARM inter
2. Cabling4200-A2-GN20-10 October 20022-13ProcedureTo connect the ALARM interface:1. Strip the tips of the alarm source wires (about 1/2 inch or 12.7
2. Cabling2-14 October 2002 4200-A2-GN20-105. Connect the other end of the cable to your alarm monitoring system.Or, for Models 4220 and 4230, you ca
2. Cabling4200-A2-GN20-10 October 20022-15Grounding LugProcedureTo connect the unit to a ground:1. Strip back the insulation approximately 5/16 of an
C October 2002 4200-A2-GN20-1013. The equipment is intended for installation in a max. 65° C ambient temperature, in an environment that is free of du
2. Cabling2-16 October 2002 4200-A2-GN20-10Power ConnectorThe GranDSLAM 4200 is powered by a –48 VDC source providing –40.5 to –57.0 VDC. Dual power
2. Cabling4200-A2-GN20-10 October 20022-173. Insert the plug into either the A or B power input terminal on the front panel of the GranDSLAM 4200.4. I
2. Cabling2-18 October 2002 4200-A2-GN20-10
4200-A2-GN20-10 October 20023-13LEDsLED LocationsThe locations of the System and DSL Port LEDs on the front panel of the GranDSLAM 4200 are shown in F
3. LEDs3-2 October 2002 4200-A2-GN20-10LED MeaningsWhen power is first applied to the unit, it performs a power-on self-test. When this test is succe
4200-A2-GN20-10 October 20024-14ConfigurationOverviewThe GranDSLAM 4200 is designed to require minimal configuration before it can be accessed by a Ne
4. Configuration4-2 October 2002 4200-A2-GN20-10Using the CLI The GranDSLAM 4200 uses Transaction Language No. 1 (TL1) language for CLI commands and
4. Configuration4200-A2-GN20-10 October 20024-3Command query. You can obtain help with CLI commands by typing a ? (question mark). A question mark alo
4. Configuration4-4 October 2002 4200-A2-GN20-10Turn-up Procedure for Inband ManagementProcedureTo turn up the GranDSLAM 4200 using inband management
4. Configuration4200-A2-GN20-10 October 20024-56. Change the time, if necessary. The Simple Network Time Protocol (SNTP), which maintains the unit’s c
4200-A2-GN20-10 October 2002DJapanClass A ITEThis is a Class A product based on the standard of the Voluntary Control Council for interference by Info
4. Configuration4-6 October 2002 4200-A2-GN20-10
4200-A2-GN20-10 October 2002A-1AConnectors and Pin AssignmentsOverviewThe following sections provide pin assignments for:Management Port Connector on
A. Connectors and Pin AssignmentsA-2 October 2002 4200-A2-GN20-10DSL Ports and POTS Splitter ConnectorsThe 50-pin RJ21X Telco connector labeled DSL P
A. Connectors and Pin Assignments4200-A2-GN20-10 October 2002A-3Management Port ConnectorThe Management (MGMT) connector is an 8-pin unkeyed modular j
A. Connectors and Pin AssignmentsA-4 October 2002 4200-A2-GN20-10Model 4210 ALARM/BITS ConnectorThe alarm relay reports major alarms through the ALAR
A. Connectors and Pin Assignments4200-A2-GN20-10 October 2002A-54201 T1 Uplink Module ConnectorThe 4201 T1 Uplink Module 100Ω connector is a single, R
A. Connectors and Pin AssignmentsA-6 October 2002 4200-A2-GN20-104202 E1 Uplink Module Connectors The 4202 E1 Uplink Module has two types of connect
A. Connectors and Pin Assignments4200-A2-GN20-10 October 2002A-74203 T1/E1 IMA Uplink Module Port ConnectorsThe 4203 T1/E1 IMA Uplink Module port conn
A. Connectors and Pin AssignmentsA-8 October 2002 4200-A2-GN20-10
4200-A2-GN20-10 October 2002B-1BEquipment List Table B-1. GranDSLAM 4200 Equipment List (1 of 4)Description Model NumberGranDSLAM 4200 (24-Port) Reach
E October 2002 4200-A2-GN20-10
B. Equipment ListB-2 October 2002 4200-A2-GN20-10GranDSLAM 4200 (24-Port) ReachDSL with 4203 T1/E1 IMA Uplink Module, without POTS Splitter, with EME
B. Equipment List4200-A2-GN20-10 October 2002B-3GranDSLAM 4200 (24-Port) ADSL without Uplink Module, with POTS Splitter, with Japan defaultsIncludes G
B. Equipment ListB-4 October 2002 4200-A2-GN20-10GranDSLAM 4200 (24-Port) ADSL with 4203 T1/E1 IMA Uplink Module, with POTS Splitter, with U.S. defau
4200-A2-GN20-10 October 2002C-1CTechnical SpecificationsTechnical specifications are subject to change without notice. Table C-1. GranDSLAM 4200 Techn
C. Technical SpecificationsC-2 October 2002 4200-A2-GN20-10InterfacesGranDSLAM 4200:DSL PORTS: 50-pin RJ21X Telco-type connectorPOTS: 50-pin RJ21X Te
4200-A2-GN20-10 October 2002IN-1IndexNumerics100-ohm port description, 1-3120-ohm port description, 1-375-ohm port description, 1-3Aadministrator,
IndexIN-2October 2002 4200-A2-GN20-10Gglossary URL, ivGranDSLAM 4200features, 1-1models, 1-1grounding lug, 1-8, 2-15Hhardware kit contents, 1-5Ii
Index4200-A2-GN20-10 October 2002IN-3TT1 Uplink Module100-ohm connector, A-5connecting, 2-3pin asssignments, A-5T1/E1 IMA Uplink Moduleconnecting,
IndexIN-4October 2002 4200-A2-GN20-10
4200-A2-GN20-10 October 2002iContentsAbout This GuideDocument Purpose and Intended Audience . . . . . . . . . . . . . . . . . . . . iiiNew Features
Contentsii October 2002 4200-A2-GN20-103LEDsLED Locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1LE
4200-A2-GN20-10 October 2002iiiAbout This GuideDocument Purpose and Intended AudienceThis document is written for technicians who install the GranDSLA
Commentaires sur ces manuels